{"id":38303,“日期”:“2022 - 08 - 09 - t14:04:02”,“date_gmt”:“2022 - 08 - 09 - t22:04:02”,“guid”:{“呈现”:“http: \ / \ / o6m.6up85.com \ /?page_id = 38303 "},“修改”:“2022 - 10 - 11 - t14:11:03”,“modified_gmt”:“2022 - 10 - 11 - t22:11:03”,“鼻涕虫”:“eva-creek-wind”,“状态”:“发布”,“类型”:“页面”,“链接”:“http: \ / \ / o6m.6up85.com \ /services\/energy\/sources-of-power\/eva-creek-wind\/","title":{"render ":"Eva Creek Wind"},“内容”:{“呈现”:“\ r \ n \ r \ n \ r \ n \ \ t t
\r\n\r\n\t\t\r\n\t\t\t\r\n\t\t\t\t\r\n\t\t\t\t
\ r \ n \ r \ n \ t \ t \ \ \ t\ r \ n \ r \ n \ t \ t \ \ \ t \ t \ \ \ t \ t \ \ t
\ r \ n \ t \ \ t \ t \ \ \ t
\ r \ n \ t \ t \ t \ \ \ t \ \ t\"\"\ r \ n \ t \ \ t \ t \ \ \ t<\/div>\ r \ n \ t \ \ t \ t \ \ \ t\ r \ n \ t \ \ t \ t \ \ \ t\ r \ n \ t \ \ t \ t \ \ \ t<\/div>\ r \ n \ t \ \ t \ t \ \ \ t
\ r \ n \ t \ t \ t \ \ \ t \ \ t

Eva Creek Wind Output Statistics<\/p>\ r \ n \ t \ \ t \ t \ \ \ t<\/div>\ r \ n \ r \ n \ t \ t \ \ \ t<\/a>\r\n\r\n\t\t\t\t<\/div>\r\n\r\n\t\t\t\r\n\t\t\r\n\t<\/div>\r\n\r\n\n

看看这5分钟 video about the Eva Creek Wind Farm<\/a> explaining what went into constructing the Eva Creek Wind Farm.<\/p>\n

The first power from Eva Creek Wind came into the grid at 9 a.m. 2012年10月24日. On January 7, 2013, all 12 turbines were fully tested, commissioned and generating power.<\/p>\n

不到25兆瓦, Eva Creek is the largest wind project in Alaska and the first by any Railbelt utility. It is located 14 miles from Healy at the top of the 10-mile Ferry mining road.<\/p>\n

The Eva Creek Wind project is visible from the Parks Highway. As you\u2019re headed north out of Healy, look to the right in the vicinity of Milepost 263.<\/p>\n

The addition of Eva Creek Wind is exciting for Golden Valley Electric Association (GVEA) and the Interior as a whole. The project integrates well into GVEA\u2019s system and enables the cooperative to meet its Renewable Energy<\/a> Pledge ahead of schedule. Eva Creek Wind also helps reduce the Interior\u2019s dependence on oil for power generation.<\/p>\n

Fast Facts<\/h2>\n
    \n
  • 能力:\ u00a0 24.6 megawatts<\/li>\n
  • 帮助GVEA实现其可再生能源承诺, which called for 20% of the system\u2019s peak load to be generated by renewable resources by 2014. GVEA\u2019的2014年峰值负荷为201.6兆瓦(MW).<\/li>\n
  • 2013 Capacity Factor:\u00a0 33%<\/li>\n<\/ul>\n

    Project Information<\/h2>\n
      \n
    • Total Project Costs:\u00a0 $93 million<\/li>\n
    • 州拨款:13美元.4 million<\/li>\n
    • Amount Capitalized:\u00a0 $84 million<\/li>\n
    • GVEA-Owned and Operated<\/li>\n
    • General Contractor:\u00a0 Michels Wind Energy<\/li>\n<\/ul>\n

      Turbine Statistics<\/h2>\n
        \n
      • Turbines:\u00a0 12\u00a0Senvion turbines (MM92, Cold Climate Version Machines)<\/li>\n
      • Turbine Hub Height:\u00a0 262 feet (80 meters)<\/li>\n
      • 转子直径:\u00a0 303英尺(92.5 meters)<\/li>\n
      • Height of Turbine from Base to Blade Tip: Approximately 410 feet (125 meters)<\/li>\n
      • 最小风速:6.7 mph<\/li>\n
      • 最大风速:53.7 mph<\/li>\n<\/ul>\n

        Project Timeline<\/h2>\n

        Pre-2009<\/h3>\n
          \n
        • Installed first meteorological wind monitoring towers (2003)<\/li>\n
        • Began wind-integration studies to make sure the wind power will work on GVEA\u2019s system (2007)<\/li>\n<\/ul>\n

          2009<\/h3>\n
            \n
          • Installed 2 80-meter MET towers at Eva Creek site and 1 50-meter MET tower on Walker Dome for further wind testing<\/li>\n<\/ul>\n

            2010<\/h3>\n
              \n
            • Wetland survey and avian migration studies conducted for permitting process<\/li>\n
            • Geotechnical investigation done for road and site improvements<\/li>\n
            • Met with Alaska Railroad Corporation regarding rail access issues<\/li>\n<\/ul>\n

              2011<\/h3>\n
                \n
              • Began infrastructure design (road, intertie, tower foundation and communications)<\/li>\n
              • Contracts awarded; Michels Wind Energy is the general contractor<\/li>\n
              • Conducted cultural resources surveys and wetlands field surveys<\/li>\n
              • Road improvements began<\/li>\n
              • 获得欧盟许可.S. 陆军工程兵团, 阿拉斯加州, 自然资源司; began public and agency review process for land lease, 材料网站, 销售合同, 交流网站, 道路改善, 和调整, 等.<\/li>\n
              • Selected REpower as turbine manufacturer<\/li>\n<\/ul>\n

                2012<\/h3>\n
                  \n
                • 阿拉斯加州, 自然资源司, executed Early Entry Authorization for the construction, 操作,<\/li>\n
                • maintenance and use of the wind farm<\/li>\n
                • Construction and turbine erection<\/li>\n
                • First wind power hit the grid (October 24)<\/li>\n
                • Commissioning and testing<\/li>\n
                • All 12 turbines commissioned (December 31)<\/li>\n<\/ul>\n

                  2013 to 2014<\/h3>\n
                    \n
                  • Full commercial output (January 7, 2013)<\/li>\n
                  • Post-construction avian mortality studies to be conducted for the spring and fall migrations as a part of GVEA\u2019s United<\/li>\n
                  • 州鱼 & Wildlife Avian Protection Plan (2013 and 2014)<\/li>\n<\/ul>\n

                    2016<\/h3>\n
                      \n
                    • In August and September, all 12 turbines were fitted with sensing devices<\/li>\n
                    • 这样,如果任何轴承失效, they will be detected instantly and the turbines will automatically shut down, pending visual inspection<\/li>\n<\/ul>\n

                      2017 to 2019<\/h3>\n
                        \n
                      • Continued full commercial output with no issues<\/li>\n<\/ul>\n

                        2020<\/h3>\n
                          \n
                        • 在2月份, Senvion (the original equipment manufacturer) declared bankruptcy and was purchased by Siemens Gamesa of Germany<\/li>\n
                        • They faulted on their contract to perform the 操作s and maintenance on the facility<\/li>\n
                        • GVEA took over the 操作s and maintenance of Eva Creek Wind Farm in March 2020<\/li>\n
                        • Reliable wind energy continues to be provided<\/li>\n<\/ul>\n",“受保护的”:假},“摘要”:{“呈现”:“

                          看看这5分钟 video about the Eva Creek Wind Farm explaining what went into constructing the Eva Creek Wind Farm. The first power from Eva Creek Wind came into the grid at 9 a.m. 2012年10月24日. On January 7, 2013, all 12 turbines were fully tested, commissioned and generating power. 只是[…]\n”,“受保护的”:假},“作者”:20,“featured_media”:0,“父”:37380,“menu_order”:0,“comment_status”:“封闭”,“ping_status”:“封闭”,“模板”:“,“元”:{“inline_featured_image”:假的,"脚注":" "},“_links”:{“自我”:[{“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/pages\/38303"}],"collection":[{“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/pages"}],"about":[{“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,“href”:“http: \ / \ / o6m.6up85.com \ / wp-json \ / wp \ / v2 \ /评论?post=38303"}],"version-history":[{"count":7,“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/pages\/38303\/revisions"}],“predecessor-version”:{" id ": 39224,“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/pages\/38303\/revisions\/39224"}],《推荐十大正规网赌平台》:[{“嵌入”:真的,“href”:“http: \ / \ / o6m.6up85.com \ /wp-json\/wp\/v2\/pages\/37380"}],"wp:attachment":[{“href”:“http: \ / \ / o6m.6up85.com \ / wp-json \ / wp \ / v2 \ /媒体?parent=38303"}],"curies":[{"name":"wp","href":"http:\/\/api.w.org \ / {rel}”、“模板化”:真}]}}